Location Date

Proposal

Comments
ILL/PF1B 12/2011 Accepted Under Analysis(LM/AP/JM)
ILL/PF1B 06/2012 Accepted Under Analysis (LM/AP/JM)
LPSC/GENEPI   Accepted Schedule TBC - 02/2013

 

STEFF in the PF1B area complete with NaI gamma and NE213 neutron detectors.

STEFF during installation at PF1B

Image of the neutron beam on a paper target used to check alignment.

The field-shaping rings and anodes of one of the Bragg detectors

The thin formvar SED foil of the STOP secondary-electron detector